The oracle 10g DB that is being currently used has exceeded the limit of 4GB. For the application to continue the db needs to be upgraded to 11g. But the upgrade doc requires a data pump export to be done from 10g and then data pump import it to 11g.
But the concern is the 10g exceeding its limit of 4GB and hence will not allow a data pump export to be done. Is there any alternate option to move the data to 11g other than data pump export and import.
Have tried the export with expdp but i get an error saying the database has exceeded th 4gb limit.
0 Answers